Boston Avenue, Medford

Dear T: Time for Arlington to get what it pays for

November 26, 2024

Boston Avenue, entering Somerville.

Paul Schlichtman, chairman of the School Committee, offers this viewpoint about the MBTA as an Arlington citizen and longtime transportation advocate.

There were many sad songs being sung on the replacement shuttle buses east of Harvard Square last week, when the MBTA shut down the Red Line through downtown to Broadway for track repair.

Returning home to Arlington, many folks who spent a large chunk of their day on the molasses replacement shuttles wondered: Could there be a better way? An alternate route? Another way to take transit into the city?

There is. Sort of.

Extension opens, then service cut

On Dec. 12, 2022, the MBTA opened the new Green Line Extension, with a terminal at Medford-Tufts. Wonderful! It’s a short six- to 12-minute bus ride between Arlington Center and Medford-Tufts on the Route 80 bus. But six days later, the MBTA cut service on the route, creating 45-to 60-minute gaps between buses.

It would be bad enough if the Medford-Tufts transfer point was in front of the train station. But it isn’t. The closest bus stop is about one-tenth of a mile west of the station, a three-minute walk from the headhouse.

Nothing discourages transit ridership more than an hour wait for a curbside transfer at an isolated bus stop, and nothing encourages a reduction of service more than low ridership generated by poor service.

Sadly, this shouldn’t be a surprise.

Changes led to first for public schools

The MBTA eliminated the 79 (Arlington Heights-Alewife) bus, claiming it duplicated service on the 77 (Arlington Heights-Harvard). Then the T cut service on the 77. It cut service on the 77 after Cambridge disrupted a large chunk of Mass. Ave. to install bus lanes. The infrequent and undependable service on the 77 compelled the Arlington Public Schools to institute parallel school bus service for the first time in history just to get students to school on time.

It’s time to get what we pay for. Arlington Town Meeting recognized the issue, passing resolutions in 2023 and 2024 calling for a level of bus service that corresponds to the $3.4 million in town funding that is garnished for its MBTA assessment.

Friends and neighbors are organizing to advocate for improved transit service in Arlington. Extend the Red Line had a booth at this year’s soggy Town Day celebration, which generated a steady stream of interest.

Improve service

While the long-term goal of Extend the Red Line is described in its name, its short-term goal is focused on improving bus service.

While the restoration of frequent and reliable service on the 77 is a priority, adding a frequent and reliable route to connect with the Green Line at Medford-Tufts is another project that would benefit riders in Arlington and beyond. While a connection to the Green Line will provide obvious benefits for Arlington residents, the connection will also enable the Tufts community to enjoy the Regent Theatre, restaurants, shops and other amenities in Arlington. It would also pass two short blocks from the West Medford train station, opening an additional commuting option for riders in that corridor.

Arlington is currently on the road to car constipation. We won’t reverse the deterioration of MBTA service unless we unite in advocating for the transit we need. Arlington has a strong argument for significant improvements, but our case needs to be made firmly and frequently. Let’s all work together to obtain the quality public transportation we need to sustain our community.

 
Sept. 28, 2024: Red Line to Arlington? First, the T chief has to come to town
 

This opiniion by Paul Schlichtman was published Tuesday, Nov. 26, 2024.

This reporting demonstrates your donations at work to support democracy here. YourArlington is a 501(c)(3) nonprofit.Your contributions are tax-deductible. 

 

Bob Sprague

You can see Bob Sprague's resume at www.yourarlington.com/participate/17/2396-resume-bob-sprague

3 Comments

  1. Didn’t Arlington refuse to have the Alewife station there because they wanted to preserve their gentrification? You should include that history.

  2. Most of the people who were opposed to the Red Line in 1976 currently reside in cemeteries. Arlington is a very different town than it was 48 years ago.
    In 1975, Arlington voted 6393-7215 to reject a $19.3 million high school construction project that came with 65% state funding.
    In 2019, Arlington voted 9721-2930 to approve a $291 million high school construction project with $84.7 million (about 30%) state funding, and in the same election voted 8655-4029 to approve a $5 million operating override.
    In 2023, Arlington Town Meeting voted 169-41-1 to [url=https://malegislature.gov/Bills/193/H4236]request a home rule petition to repeal Ch. 439 of the Acts of 1976[/url], prohibiting the construction of a mass transit facility within 75 yards of Arlington Catholic High School.
    There were no package stores, and only three restaurants with liquor licenses. With the expansion of liquor licensing, Arlington became a dining destination.
    The town has changed. We shouldn’t be locked into a bad decision, as people in cemeteries shouldn’t prevail over living, breathing voters in 2024.

  3. Is it really so hard to acknowledge racism? Does it pain you that much that you must write paragraphs AROUND it, when you could just say it. Yes, those racist people died. Yes, you still benefit from the institutionalized racism that informed the infrastructure that still remains.

Comments are closed.

Events

Free newsletter

Weather

Obituaries

Please Support Our Generous Sponsors

Judy Weinbger Leading Edge Real Estate logoIntelligent Labor and Moving logoArts Arlington logo
Go toTop

Don't Miss