Touched by emails from youth
“There’d never been a project that generated more interest in my whole time with the CPA than Hill’s Hill. I’m very touched by the number of emails we received by Arlington’s youth. We got lots and lots of emails,” said Rowe.
In approving the Hill’s Hill project, the committee voted to require three conditions.
1. An Open Space Committee member must be included in the working group;
2. The design process must include a tree inventory; and
3. The design process must produce at least two options for the pump track. If the pump track is to be located in the woods, the CPA Committee must approve it before construction can proceed.
“We need a site-specific design and would like to keep the big trees. Change is hard. The neighbors are worried about what will happen. I’m proud of everyone who’s advocated for it,” she added.
However, some other people are concerned about the proposed pump track there — an infinite loop of rollers and berms designed to improve bike handling. According to the Save Hill’s Hill website, this multiacre tract of land is one of only a handful of wooded areas remaining in Arlington. This natural habitat also has a small hilltop meadow and is home to a variety of plants and animals.
Board member feedback
Newly named Select Board Chair Eric Helmuth said that he is impressed and gratified by this “on all fronts. I’m glad there’s been a rapprochement of sorts regarding the environment.”
But many town residents oppose this construction because of terrain and climate issues — and have voiced their concerns at Select Board meetings. Lawn signs saying “Save Hill’s Hill” have sprung up along Summer Street and other places in town.
John Hurd, chosen as Select Board vice chair that night, said it’s important to have open space for youth and adults and that he believes that this project won’t adversely affect the tree canopy. “I think this will be done well and trust the people on board and look forward to the result. Additionally, the Recreation Department will reach out to the Bicycle Advisory Committee to see if [it] can get used bikes for those who cannot afford them.”
Board member Diane Mahon said she strongly supports the bike trails and is especially excited about the potential ability to rent bikes.
“The more things to do in Arlington, the better,” said board member Len Diggins.
Additional CPA projects
Rowe also presented the board with 15 additional proposed projects, including restoring Town Hall, a “beautiful building that needs help.”
“We were $1 million over budget when we started, so [we] had to ask applicants to try to reduce their money applications,” she said. “Recreation Department complied, which was helpful, because they’re the ones who ask for the most. We got down to the number we had to get down to.”
The CPA plan now is scheduled to go to Town Meeting, which is to start April 24. To see the funding chart, which lists each project, applicant(s), amount applied for, amount provided and the funding purpose, click here >>
See all documents related to this agenda item here >>
More from the April 3 meeting will be reported.
Watch entire April 3 meeting on ACMi:
Aug. 3, 2023: More than 80 hear discussion of Hill’s Hill bike-park plan
This news summary, by YourArlington freelance writer Susan Gilbert, was published Wednesday, April 5, 2023. It was updated later that same day to clarify copy and on April 8, to correct a typo.
This reporting demonstrates your donations at work to support democracy here. YourArlington is a 501(c)(3) nonprofit.Your contributions are tax-deductible.





