Listen to the Fincom majority: Support Minuteman

May 8, 2016

The Finance Committee report supporting a vote to rebuild Minuteman High School is a good read for everyone in town. Savor every word, including the valuable charts >> 

The best part is the history lesson in last paragraph delivered by Al Tosti, chairman:

“Let me end with a story about what happened to the Arlington High School renovation in the 1970s.

“The original proposal involved the replacement of several older structures with new construction so the buildings could tie together well. It also involved the creation of a field house and swimming pool for the school. The State would have paid over 60%.

“Twice citizens took the proposal to referendum to block it. Both times the building project was defeated.

“The school committee went back to the drawing board and 2 years later came back with a renovation-only proposal, which finally passed without being blocked by referendum. State reimbursement had dropped, inflation had raised the cost, and we ended up with the current high school with all of its problems for a higher cost to the taxpayer.

“I can’t say that will happen here, but I think it is a significant possibility.”

The message? Don’t let Arlington history report itself in the current Minuteman case. Stay on track with those towns supporting the project.

The report does not ignore real concerns. They include obstacles the school faces in reaching needed enrollment, to keep Arlington’s share fair (34 percent of the school’s student come from Arlington).

Obstacles include a rule established last year limiting Minuteman’s out-of-district student population.

The Fincom report addresses the issue: “So how does the new Minuteman make up for these lost students? Their response, which the Minuteman Superintendent will discuss at Town Meeting [on May 9], is threefold:

“1. They are rolling out a new recruiting strategy to convince parents and students that their new and existing technical programs are a perfect stepping stone for students seeking to go on to study science and technology at the college level. They would also be able to go directly to a well-paying job to help pay those college costs.

“2. The new building is constructed for programs that the current building simply cannot provide adequately.

“3. A new modern up-to-date building will attract many new students and parents turned off by the old 1970s-style school, which we agree has many problems.”

The report admits it has no crystal ball and lays out the risk. It says: “Whether these will be sufficient to fill the building is the great unknown of this complex issue.”

There are further worries: “If this project is turned down by its members, there is a significant possibility that the MSBA, which is funding approximately $44 million of this $144 million project, will walk away and shift that funding to other facilities.

“If that happens, the 10 towns in the district will be saddled with the cost of renovating a largely obsolete building. How much will this cost? The Minuteman building committee estimates that it will cost approximately $100 million to renovate the building, fix systems and roofs that need work and bring the building up to current building codes.”

In the end, including a razor-thin 10-8 vote, the Finance Committee supports endorsing “the project as proposed by Minuteman, because the risks of not proceeding outweigh the risks of stopping the project and starting all over again.”

Town Meeting members on May 9 will want to know how to move forward given Belmont’s rejection. Look for Selectmen Dan Dunn, one of the key figures in reaching a Minuteman agreement this winter, and Superintendent Edward A. Bouquillon to suggest how our neighbor might be brought back into the fold.

Don’t let town history from the mid-1970s have the last word. Listen to the balanced support from the Finance Committee.


This viewpoint was published Sunday, May 8, 2016.

Bob Sprague

You can see Bob Sprague's resume at www.yourarlington.com/participate/17/2396-resume-bob-sprague

Events

Free newsletter

Weather

Obituaries

Please Support Our Generous Sponsors

Judy Weinbger Leading Edge Real Estate logoIntelligent Labor and Moving logoArts Arlington logo
Go toTop

Don't Miss